We are committed to our implementation of the zero-defect quality management philosophy by adapting the ISO 9001 quality management system. This quality sense has been implemented on each process. We also have very strict supplier verification system, and we implement the regular audit to assure the best quality raw materials. Only qualified suppliers can be our cooperators.

With advanced imported measuring devices and efficient control system, the quality of each mold is assured by our professional quality engineers from design to construction to sample to pre-shipment.

1.Mould Design Control
2.Mould Steel Hardness Inspection
3.Mould Electrodes Inspection
4.Mould Core and Cavity Steel Dimension Inspection
5.Mould Pre-Assembly Inspection
6.Mould Trial Report and Samples Inspection
7.Pre-Shipment Final Inspection
8.Export Product Package Inspection